TY - JOUR KW - Supply chain uncertainty KW - Dual-channel strategy KW - Buffer space KW - Just-in-time delivery KW - Prefabricated construction supply chain KW - Two-stage stochastic programming AU - Zhen-Song Chen AU - Jie-Qun Ruan AU - Vineeth Dharmapalan AU - Mirosław Skibniewski AB - Prefabricated construction supply chains face uncertain daily demand and limited production capacity, but existing models often assume sufficient capacity or deterministic demand. This paper presents a two-stage stochastic programming model with a dual-channel strategy that combines direct factory-to-site delivery with temporary warehouse storage. The first stage determines production rates, fleet sizes, warehouse capacity, and advance-production lead time. The second stage adjusts daily production, inventory, and shipments for each demand scenario. Computational experiments compare the strategy with just-in-time (JIT) delivery and a warehouse-only configuration. The dual-channel strategy lowers expected total system cost relative to the warehouse-only configuration in all tested conditions, by 7.58% on average. Its average saving over JIT is 4.81%, but JIT is more cost-effective with longer construction durations or sufficient production capacity. The dual-channel strategy has an essentially zero expected shortage rate, whereas JIT averages 0.389%. A case study illustrates the model’s project-level application. BT - Automation in Construction DO - https://doi.org/10.1016/j.autcon.2026.107349 N2 - Prefabricated construction supply chains face uncertain daily demand and limited production capacity, but existing models often assume sufficient capacity or deterministic demand. This paper presents a two-stage stochastic programming model with a dual-channel strategy that combines direct factory-to-site delivery with temporary warehouse storage. The first stage determines production rates, fleet sizes, warehouse capacity, and advance-production lead time. The second stage adjusts daily production, inventory, and shipments for each demand scenario. Computational experiments compare the strategy with just-in-time (JIT) delivery and a warehouse-only configuration. The dual-channel strategy lowers expected total system cost relative to the warehouse-only configuration in all tested conditions, by 7.58% on average. Its average saving over JIT is 4.81%, but JIT is more cost-effective with longer construction durations or sufficient production capacity. The dual-channel strategy has an essentially zero expected shortage rate, whereas JIT averages 0.389%. A case study illustrates the model’s project-level application. PY - 2026 EP - 107349 T2 - Automation in Construction TI - Dual-channel optimization of prefabricated construction supply chains using two-stage stochastic programming UR - https://www.sciencedirect.com/science/article/pii/S092658052600590X VL - 193 SN - 0926-5805 ER -